conceptual design
design development
rezoning process (n/a)
development permit (n/a)
building permit process (n/a)
working drawings (n/a)
construction admin : office (n/a)
construction admin. : site (n/a)

dr. reiterer : office / clinic renovation
blechturmgasse 26/6, 1040 vienna
construction begin : 1997 - completion : 1998
Dr. Reiterer came to us with a recently leased space for his practice. The time line he presented was very short and the budget small. He wished to limit the renovation to the reception area and examining room behind.
We convinced the doctor to separate the examining room and the reception
with frosted C-channel glass, as the only light source to the space came from a large light well at the rear of the office. Concerns about privacy were dealt with by adding a horizontal pull-down blind on the examining room side.